Results
111 result(s), displaying 97 to 108
Ergon Energy – Ring-fencing waiver (streamlined process) – December 2023
On 4 December 2023 the AER granted a waiver for Ergon Energy, with conditions.
Type
Ring-fencing
Status
Current
Energex – Ring-fencing waiver (streamlined process) – December 2023
On 4 December 2023 the AER granted a waiver for Energex, with conditions.
Type
Ring-fencing
Status
Current
Ergon Energy - Ring-fencing waiver (streamlined process) – March 2024
On 27 March 2024 the AER granted a waiver for Ergon Energy to trial battery energy storage unit, with conditions.
Type
Ring-fencing
Status
Current
Directlink - Determination 2025–30
Directlink electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open
Ergon Energy Ring-fencing Waiver - Field Services for Powerlink - October 2024
Ergon Energy Network is requesting a ring-fencing waiver in order to provide field services to Powerlink
Type
Ring-fencing
Status
Open
Ergon Energy - Determination 2025–30
Ergon Energy electricity revenue determination for the 2025–30 period
Type
Determinations
Status
Open
Energex - Determination 2025–30
Energex electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open
Ring-fencing guideline (electricity transmission) 2025
The AER has released version 5 of the ring-fencing guideline for electricity transmission.
Type
Ring-fencing
Status
Current
Ring-fencing guideline (electricity distribution) 2025
The AER has released version 4 of the ring-fencing guideline for electricity distribution.
Type
Ring-fencing
Status
Current
Jemena - Ring Fencing Decision - Phillip Creek Compressor Station
The AER has made a final decision to grant exemptions to Jemena from their ring-fencing obligations for the Phillip Creek Compressor Station.
Type
Ring-fencing
Status
Current
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current