Results
180 result(s), displaying 1 to 12
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
Jemena Gas Networks - 2024–25 tariff variation notice
Jemena proposed new network prices to apply to its NSW gas network for 2024–25.
Type
Tariff variations
Status
Current
Ausgrid – 2024–25 pricing proposal
Ausgrid proposed new network prices to apply to its electricity distribution network network for 2024–25.
Type
Pricing proposals
Status
Current
Endeavour Energy – 2024–25 pricing proposal
Endeavour Energy proposed new network prices to apply to its New South Wales electricity distribution network for 2024–25.
Type
Pricing proposals
Status
Current
Essential Energy – 2024–25 pricing proposal
Essential Energy proposed new network prices to apply to its New South Wales electricity distribution network for 2024–25.
Type
Pricing proposals
Status
Current
Transgrid VNI West contingent project application stage 1 early works
Transgrid Victoria to NSW Interconnector West (VNI West) contingent project application stage 1 early works
Type
Contingent projects
Status
Current
Transgrid - Ring-fencing waiver - Telecommunications services - April 2024
Transgrid seeking a waiver from transmission ring-fencing guideline to continue to own and operate 6 telecommunications services for a period of 12 months.
Type
Ring-fencing
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Essential Energy - Ring-fencing waiver - training services
Essential Energy submitted a ring-fencing waiver application under clause 5.2 of the Electricity Distribution Ring-fencing Guideline.
Type
Ring-fencing
Status
Open