TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28