Results
15 result(s), displaying 1 to 12
AusNet Services VEBM cost pass through application
AusNet Services Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Current
Powercor - Contingent project - installation of Rapid Earth Fault Current Limiters - tranche 2
Type
Contingent projects
Status
Current
AusNet Services - Contingent project - installation of Rapid Earth Fault Current Limiters - tranche 2
Type
Contingent projects
Status
Current
Power and Water – Cost pass through – extension of time limit to submit 2018 application
Type
Cost pass throughs
Status
Current
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current