Results
2 result(s), displaying 1 to 2
ElectraNet - Heywood interconnector upgrade regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Historical
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current