Results
17 result(s), displaying 1 to 12
AusNet Services VEBM cost pass through application
AusNet Services Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
AusNet Services (formerly SPI PowerNet) - Ring fencing waiver 2005 - request for revocation
Type
Ring-fencing
Status
Revoked
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - February 2024 storm
AusNet's cost pass through application relates to distribution network costs incurred during Victoria's February 2024 storm.
Type
Cost pass throughs
Status
Current
Ergon Energy Cyclone Jasper cost pass through application
Ergon Energy's cost pass through application for Cyclone Jasper
Type
Cost pass throughs
Status
Open