Results
22 result(s), displaying 1 to 12
AusNet Services VEBM cost pass through application
AusNet Services Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
Powerlink - Contingent project South Pine to Sandgate 2007
Type
Contingent projects
Status
Historical
EnergyAustralia - Contingent project Replacement of feeder cables 908 and 909 - 2008
Type
Contingent projects
Status
Historical
AusNet Services (formerly SPI PowerNet) - Ring fencing waiver 2005 - request for revocation
Type
Ring-fencing
Status
Revoked
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open