AusNet Services VEBM cost pass through application
AusNet Services Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Current
Origin Retailer of Last Resort Cost Recovery Applications
The AER has approved Origin Energy's six cost recovery applications for costs incurred as the Retailer of Last Resort for retailer failures in 2022.
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - Easement land tax 2024–25
AusNet Services - Cost pass through - Easement land tax 2024–25
Type
Cost pass throughs
Status
Current
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - February 2024 storm
AusNet's cost pass through application relates to distribution network costs incurred during Victoria's February 2024 storm.
Type
Cost pass throughs
Status
Current