APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
Main Central-West Orana Renewable Energy Zone network project (contestable)
Read our determination on the amounts to be paid to ACEREZ for the main Central-West Orana REZ network project.
Type
Determinations
Status
Open
TasNetworks North West Transmission Developments Stage 1 – Early Works Contingent Project
On 10 October 2024, TasNetworks submitted its contingent project application seeking to increase its revenue to fund early works on NWTD stage 1 early works.
Type
Contingent projects
Status
Open
Power and Water Corporation - Ring Fencing Decision - McArthur River Mining Pipeline
The AER has made a final decision to grant an exemption to Power and Water from their ring-fencing obligations for the McArthur River Mining Pipeline.
Type
Ring-fencing
Status
Current
Origin Retailer of Last Resort Cost Recovery Applications
The AER has approved Origin Energy's six cost recovery applications for costs incurred as the Retailer of Last Resort for retailer failures in 2022.
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
Amadeus Gas Pipeline - 2024–25 tariff variation notice
Amadeus proposed new network prices to apply to its NT gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
Roma to Brisbane Pipeline - 2024–25 tariff variation notice
Roma to Brisbane proposed new network prices to apply to its Qld gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
Transgrid - Ring-fencing waiver - Telecommunications services - April 2024
Transgrid seeking a waiver from transmission ring-fencing guideline to continue to own and operate 6 telecommunications services for a period of 12 months.
Type
Ring-fencing
Status
Current
AusNet Services - Cost pass through - Easement land tax 2024–25
AusNet Services - Cost pass through - Easement land tax 2024–25
Type
Cost pass throughs
Status
Current
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open