Results
9 result(s), displaying 1 to 9
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
Victoria: December 2026 - February 2027
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM).
Type
Retail Reliability Obligation
Status
Open
AusNet Services - Access Arrangement 2023–28 - Variation proposal
On 30 September 2024, AusNet Gas Services (AusNet) submitted a variation proposal for its 2023–28 gas access arrangement.
Type
Access arrangements
Status
Open
AusNet Services Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that AusNet Services can earn from customers over the period 1 April 2027 to 31 March 2032.
Type
Determinations
Status
Open
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open
AusNet Services distribution cost pass through - September 2024 storm
AusNet Services has submitted a cost pass through application to recover the costs it has incurred as a result of the September 2024 storm.
Type
Cost pass throughs
Status
Open