Results
10 result(s), displaying 1 to 10
Ergon Energy - Ring-fencing waiver - Behind the meter - August 2024
Ergon Energy waiver to install, own, operate and maintain distributed energy resources behind participating customers’ meters in isolated networks in Queensland
Type
Ring-fencing
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Ergon Energy - Ring-fencing waiver - competitive services
On 25 July 2023, Ergon Energy submitted to the AER a ring-fencing waiver application from clauses 3.1(b) and 4.2.3 of the Ring-fencing Guideline (Electricity distribution).
Type
Ring-fencing
Status
Open
Energex - Annual pricing 2023–24
Energex submitted to the AER an annual pricing proposal for its Queensland distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Ergon Energy - Annual pricing 2023–24
Ergon Energy submitted to the AER an annual pricing proposal for its Queensland distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Power and Water Corporation - Annual pricing 2023–24
Power and Water Corporation submitted to the AER an annual pricing proposal for its NT distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Amadeus Gas Pipeline - Annual tariff variation 2023–24
Amadeus Gas Pipeline submitted to the AER an annual tariff variation notice for the period 1 July 2023 - 30 June 2024.
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical
Ergon Energy – Ring-fencing waiver (streamlined process) – December 2023
On 4 December 2023 the AER granted a waiver for Ergon Energy, with conditions.
Type
Ring-fencing
Status
Current
Energex – Ring-fencing waiver (streamlined process) – December 2023
On 4 December 2023 the AER granted a waiver for Energex, with conditions.
Type
Ring-fencing
Status
Current