Results
2 result(s), displaying 1 to 2
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
Directlink - Determination 2025–30
Directlink electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open