Results
26 result(s), displaying 1 to 12
TransGrid - Network support pass through 2019–20 and 2020–21
Type
Cost pass throughs
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2022
APA Group submitted to the AER an annual tariff variation notice for its Victorian gas transmission network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
TransGrid – Expanding Victoria-New South Wales transmission transfer capacity contingent project
Type
Contingent projects
Status
Open
TransGrid - Cost pass through - 2019–20 Bushfire season
On 13 November 2020, TransGrid submitted a cost pass through application seeking to recover costs in relation to the 2019-20 bushfires in New South Wales.
Type
Cost pass throughs
Status
Current
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2021-22
Type
Tariff variations
Status
Historical