Results
16 result(s), displaying 1 to 12
ElectraNet - Eyre Peninsula Electricity Supply Options regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
APA Victorian Transmission System - Annual tariff variation 2019
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - easement land tax 2018–19
Type
Cost pass throughs
Status
Historical
TransGrid - Cost allocation method 2017
Transgrid's Cost Allocation Method (2017) was superceeded in May 2023.
Type
Cost allocation methods
Status
Historical
APA VTS (formerly APA GasNet) - Annual tariff variation 2017
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2016-17
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - easement land tax 2016
Type
Cost pass throughs
Status
Historical