Results
20 result(s), displaying 1 to 12
Essential Energy - Cost pass through - critical infrastructure licence conditions
Type
Cost pass throughs
Status
Current
TransGrid - Network support pass through 2019–20 and 2020–21
Type
Cost pass throughs
Status
Historical
Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Jemena Gas Networks (NSW) - Annual tariff variation 2021-22
Type
Tariff variations
Status
Historical
Australian Gas Networks (Albury) - Annual tariff variation 2016
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2015-16
Type
Tariff variations
Status
Historical