Overview

Sector
Electricity
Segment
Distribution
Region
New South Wales
Entities
Status
Current
Commencement date
Effective date
AER reference
212938

On 28 September 2021, Essential Energy submitted a cost pass through application to the AER seeking to recover costs in relation to new licence conditions, which require it to strengthen its cyber and physical security (critical infrastructure licence conditions). Essential Energy must achieve full compliance with the critical infrastructure licence conditions by 30 June 2024.

On 31 March 2022, the AER released its decision on Essential Energy’s critical infrastructure licence conditions cost pass through application. The AER has determined that the introduction of the critical infrastructure licence conditions is a service standard event, and also a positive change event under the National Electricity Rules. As part of our determination, we have excluded proposed capex and opex costs of $4.5 million ($2020–21) which Essential Energy included in its application for physical or property related measures as we are not satisfied these costs are incremental and clearly distinguishable from business as usual costs.

The AER has approved a pass through amount of $30.6 million ($nominal, smoothed) to be recovered as follows over two regulatory years:

  • $14.9 million ($nominal) to be recovered in 2022–23
  • $15.7 million ($nominal) to be recovered in 2023–24.