Overview

Proposal

On 27 October 2014, Australian Gas Networks (formerly known as Envestra) submitted its 2015 annual tariff variation proposal for Victoria to the AER for assessment. On 31 July 2014 Envestra (Victoria) submitted an application for mains replacement cost pass through to the AER. This is currently under consideration by the AER. Australian Gas Networks is seeking to recover any approved pass through amount in its tariffs for 2015. Australian Gas Networks has submitted two tariff schedules to the AER, one based on the current Access Arrangement without the pass through and the other with its proposed mains replacement pass through. We will approve and publish the tariff for 2015 if satisfied that the proposed reference tariff variations comply with rule requirements and Australian Gas Networks' Access Arrangement.

Australian Gas Networks (Victoria) cover letter - 2015 proposed tariff variation - 27 October 2014

Download
Authors
Australian Gas Networks Limited (AGN)
Content type
Document

Australian Gas Networks (Victoria) - Submission proposed 2015 annual tariffs with MRP PT

Download
Authors
Australian Gas Networks Limited (AGN)
Content type
Document

Australian Gas Networks (Victoria) - Submission proposed 2015 annual tariffs without MRP PT

Download
Authors
Australian Gas Networks Limited (AGN)
Content type
Document