Current regulatory period: 1 July 2013 - 30 June 2018
Murraylink is a 180km, HVDC 220 MW transmission link between Red Cliffs in Victoria and Berri in South Australia.
Line Length (km) |
---|
180 |
Not all interconnectors are listed. The unlisted interconnectors, which form part of the state based networks, are Heywood (Victoria-South Australia), QNI (Queensland-New South Wales) and New South Wales-Victoria.