On 2 May 2014, the AER approved the revised CAM submitted by Ausgrid in accordance with chapter six of the National Electricity Rules. Its revised CAM replaces Ausgrid’s previous CAM approved by the AER in 2008. Ausgrid’s previous CAM was prepared and approved by the AER under transitional arrangements which expire at the end of the 2009-14 regulatory control period. Under those transitional arrangements, Ausgrid’s previous CAM reflected as much as practicable its CAM used to prepare its last regulatory proposal for the Independent Pricing and Regulatory Tribunal.
Final decision - Cost allocation method
KPMG - Review of Ausgrid's proposed distribution cost allocation method report - January 2014
Download
Content type
Document
AER - Final decision Ausgrid revised cost allocation method - May 2014
Content type
Document