On 7 September 2022 the Australian Energy Market Operator (AEMO) published an approach paper which consults on the approach used to identify risks for consideration in the 2023 General Power System Risk Review (GPSRR), along with proposed consultation for the remainder of the review.

The AER made a submission to the consultation paper on 7 October 2022.

AER Submission - 2023 GPSRR - 7 October 2022

More information