Consultation

-

On 9 December 2024, the AER published a draft explanatory statement and also a draft of a proposed Ring-fencing guideline (electricity distribution) version 4.  

We proposed to:

  • Remove the maximum length of waivers and provide the AER with discretion to determine the duration of waivers (extending the approach already used for waivers related to energy storage and stand-alone power systems).
  • Require distribution network businesses to have annual ring-fencing compliance reports accompanied by a letter signed by the most senior executive, in-line with best practice. 

We invited stakeholders to provide submission on the draft explanatory statement and the draft guideline by 28 January 2025.

During consultation we received 13 submissions and engaged with a wide range of stakeholders.

Submissions have now closed.

Submissions

The following submissions were received in response to the draft guideline and explanatory statement released on 9 December 2024.

Ausgrid submission - AER Ringfencing review - Jan 2025_Redacted

Download
Authors
Ausgrid
Content type
Document

CPPCUE letter of submission - Distribution Ring-fencing Guideline_Redacted

Download
Authors
CitiPower / Powercor / United Energy
Content type
Document

Energex and Ergon Energy Network submission - AER ring-fencing guidelines -distribution_Redacted

Download
Authors
Energy Queensland Limited (EQL)
Content type
Document

NECA Submission - Ring Fencing Guidelines Review_Redacted

Download
Authors
NECA
Content type
Document

Red Energy - Distribution ring fencing guideline_ Version 4_Redacted

Download
Authors
Red Energy
Content type
Document