Project timeline

Overview

Update - MLO nominees

The National Electricity Rules state that a MLO generator may appoint a MLO nominee to perform the liquidity obligation on its behalf (4A.G.20(b)). When a MLO nominee is appointed, the MLO generator remains wholly responsible for the performance of the liquidity obligation (4A.G.20(c)).

The interim MLO guidelines outline that where a nominee is appointed, the nominee will need to ensure the information provided to a MLO exchange for each trading periods contains the necessary details to ensure the offers can be attributed to the appropriate MLO generator for compliance purposes. The guideline also states that the details of any nominee appointed will be published on the AER website including the details of the appointing party.

During the first 2 years of the RRO’s operation (until 30 June 2021) MLO generators have been deemed in the National Electricity Rules (11.116.12). After this time details of the MLO groups and MLO generators in each region, including any MLO nominees, will be included in the MLO register. The MLO register will be developed and published by 31 May 2021.

The table below will be used until the MLO register is published. It shows all current MLO nominee requests we have received from MLO generators.

Current market liquidity obligation nominees
Generating units Registered capacity (MW) Region MLO group MLO generator MLO nominee Effective date
Pelican Point Power Station
(units 1 to 2)
478 SA Engie

Pelican Point Power Limited

ABN
11 086 411 814
International Power (Energy) Pty Ltd
ABN
53 062 798 510
18 November 2019
Dry Creek Gas Turbine Station
(unit 1)
52 SA Engie Synergen Power Pty Limited
ABN
66 092 560 819
International Power (Energy) Pty Ltd
ABN
53 062 798 510
18 November 2019
Dry Creek Gas Turbine Station
(unit 2)
52 SA Engie Synergen Power Pty Limited
ABN
66 092 560 819
International Power (Energy) Pty Ltd
ABN
53 062 798 510
18 November 2019
Dry Creek Gas Turbine Station
(unit 3)
52 SA Engie Synergen Power Pty Limited
ABN
66 092 560 819
International Power (Energy) Pty Ltd
ABN
53 062 798 510
18 November 2019
Mintaro Turbine Station
(unit 1)
90 SA Engie Synergen Power Pty Limited
ABN
66 092 560 819
International Power (Energy) Pty Ltd
ABN
53 062 798 510
18 November 2019
Port Lincoln Gas Turbine
(units 1 to 2)
50 SA Engie Synergen Power Pty Limited
ABN
66 092 560 819
International Power (Energy) Pty Ltd
ABN
53 062 798 510
18 November 2019

Port Lincoln Gas Turbine
(units PL3)

23.5 SA Engie Synergen Power Pty Limited
ABN
66 092 560 819
International Power (Energy) Pty Ltd
ABN
53 062 798 510
18 November 2019
Snuggery Power Station
(units 1 to 3)
63 SA Engie Synergen Power Pty Limited
ABN
66 092 560 819
International Power (Energy) Pty Ltd
ABN
53 062 798 510
18 November 2019