Overview

Application

On 3 September 2018, SA Power Networks submitted to the AER a waiver application under clause 5.2 of the Electricity ring-fencing guideline 2017 (Guideline).

SA Power Networks - Waiver Extension Application - 3 September 2018

Download
Authors
SA Power Networks
Content type
Document