On 11 September 2018, the AER made a draft determination to revise several cost thresholds under clause 5.15.3 of the National Electricity Rules.
Draft determination
AER - Draft determination - Cost thresholds review - 11 September 2018
Download
Content type
Document
Submissions - Cost threshold review
-
Submissions on our draft determination closed on 16 October 2018.
CitiPower, Powercor, United Energy - Submission to AER draft determination on cost threshold review - 10 October 2018
Download
Content type
Document
Energy Queensland - Submission to AER draft determination on cost threshold review - 16 October 2018
Download
Content type
Document