Overview

Draft guideline

On 20 July 2009, the AER published a draft report containing a revised Rebidding and Technical Parameters Guideline. The draft report has been informed by submissions on the initial draft for consultation paper. This draft report considers all of the issues raised in these submissions. The AER has amended the draft Guideline based on these considerations. Where the AER has maintained its original position, further explanation has been provided. The revised draft is provided in ‘mark-up’ to enable interested parties to readily identify the material changes that have been made.

Submissions - to the draft report and revised guideline

Submissions on the Draft report closed 14 August 2009

National Generators Forum - Submission to draft report - 14 September 2009

Download
Authors
National Generators Forum (NGF)
Content type
Document