On 18 December 2008, the Australian Energy Market Commission (AEMC) Reliability Panel lodged a Rule change proposal relating to the Value of Lost Load (VoLL), the Cumulative Price Threshold (CPT) and the future review of the reliability standard and settings.
Draft determination
On 14 April 2009 we provided a submission on AEMC's draft determination.
AER submission to AEMC - NEM reliability settings draft determination - 14 April 2009
Exposure draft
AER submission to reliability panel review of VoLL and CPT - 30 October 2008