Results
4 result(s), displaying 1 to 4
NSW contribution determination guideline (2023) - Superseded
Our guideline explains how we determine the annual costs of the NSW electricity infrastructure roadmap that will then be recovered from consumers.
Type
Guidelines
Status
Historical
Revenue determination guideline for NSW non-contestable projects
Our guideline explains the Transmission Efficiency Test and how we determine revenue for network operators authorised to carry out non-contestable projects.
Type
Guidelines
Status
Historical
NSW contribution determination guideline (2022) - Superseded
The Contribution determination guideline (the Guideline) addresses cost recovery under the NSW Electricity Infrastructure Roadmap.
Type
Guidelines
Status
Historical
NSW Electricity Infrastructure Roadmap - Contribution determination 2023-24
View our decision on the maximum amount electricity distributors can pass through to consumers in 2023-24 as costs for the NSW infrastructure investment roadmap
Type
Cost pass throughs
Status
Historical