Results
38 result(s), displaying 13 to 24
Rate of return and cashflows in a low interest rate environment - Pathway to Rate of Return 2022
This is the fifth topic in a series of working papers that we will produce as part of our pathway to the 2022 Rate of Return instrument. The outcomes from these working papers will feed in to the active phase of our 2022 Rate of Return instrument review.
Type
Reviews
Status
Open
CAPM and alternative return on equity models - Pathway to Rate of Return 2022
Type
Reviews
Status
Open
International regulatory approaches to rate of return - Pathway to Rate of Return 2022
Type
Reviews
Status
Open
Valuing emissions reduction final guidance - May 2024
Our guidance on applying a value of emissions reduction.
Type
Guidelines
Status
Open
Pricing methodology guidelines 2025 - Flexibility in allocating interconnector costs
Proposed transmission pricing methodology guidelines and information templates following AEMC's rule change on interconnector costs
Type
Guidelines
Status
Open
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
ElectraNet - Cost pass through - 2022–23 Inertia network service
Type
Cost pass throughs
Status
Open
TransGrid – Expanding Victoria-New South Wales transmission transfer capacity contingent project
Type
Contingent projects
Status
Open