Results
533 result(s), displaying 529 to 533
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open
Amadeus Gas Pipeline - 2025–26 tariff variation notice
APA Group has proposed new network prices to apply to its Northern Territory gas pipeline for 2025–26.
Type
Tariff variations
Status
Open
Roma to Brisbane Pipeline - 2025–26 tariff variation notice
APA Group has proposed new network prices to apply to its Queensland gas pipeline for 2025–26.
Type
Tariff variations
Status
Open