Results
543 result(s), displaying 217 to 228
Amadeus Gas Pipeline - Annual tariff variation 2023–24
Amadeus Gas Pipeline submitted to the AER an annual tariff variation notice for the period 1 July 2023 - 30 June 2024.
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current
Loy Yang B Gas Transmission Pipeline
Type
Capacity Trading Platform and Day Ahead Auction exemptions
Status
Current
AusNet Services - Cost pass through - Easement land tax 2023–24
Type
Cost pass throughs
Status
Current
Shoalhaven Starches Bomaderry Gas Pipeline
Type
Capacity Trading Platform and Day Ahead Auction exemptions
Status
Current
Reedy Creek Wallumbilla Pipeline
APA Reedy Creek Wallumbilla Pty Ltd / ABN 88 609 218 608
Type
Non-scheme pipeline exemptions
Status
Current