Results
10256 result(s), displaying 10237 to 10248
Evoenergy (ActewAGL) - Determination 2024–29
Evoenergy revenue determination for the 2024–29 period
Type
Determinations
Status
Current
Energex - Determination 2025–30
Energex electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open
Ergon Energy - Determination 2025–30
Ergon Energy electricity revenue determination for the 2025–30 period
Type
Determinations
Status
Open
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
Type
Network exemptions
Status
Current
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
TasNetworks distribution cost pass through application – August-September 2024 storm
TasNetwork’s (distribution) September 2024 storm cost pass through application
Type
Cost pass throughs
Status
Open
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
AusNet Services - Cost pass through - February 2024 storm
AusNet's cost pass through application relates to distribution network costs incurred during Victoria's February 2024 storm.
Type
Cost pass throughs
Status
Current