Results
93 result(s), displaying 73 to 84
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
AusNet Services Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that AusNet Services can earn from customers over the period 1 April 2027 to 31 March 2032.
Type
Determinations
Status
Open
South Australia: December 2026 - February 2027
In its September 2023 update to the 2023 ESOO AEMO has forecast a 205 MW reliability gap in South Australia in 2026–27.
Type
Retail Reliability Obligation
Status
Open
TasNetworks distribution cost pass through application – August-September 2024 storm
TasNetwork’s (distribution) September 2024 storm cost pass through application
Type
Cost pass throughs
Status
Open
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open
Evoenergy - 2025–26 pricing proposal
Evoenergy proposed new network prices to apply to its ACT network for 2025–26.
Type
Pricing proposals
Status
Open
Ausgrid - 2025–26 pricing proposal
Ausgrid proposed new network prices to apply to its New South Wales network for 2025–26.
Type
Pricing proposals
Status
Open
AusNet Services - 2025–26 pricing proposal
AusNet Services proposed new network prices to apply to its Victorian network for 2025–26.
Type
Pricing proposals
Status
Open