Results
177 result(s), displaying 121 to 132
Annual Compliance Order for gas pipeline service providers 2024
The Annual Compliance Order (ACO) is the mechanism with which the AER has previously monitored the compliance of service providers with these obligations. The new ACO replaces the previous ACO, which was in place from 2008 to 2022.
Type
Guidelines
Status
Current
Valuing emissions reduction final guidance - May 2024
Our guidance on applying a value of emissions reduction.
Type
Guidelines
Status
Open
Value of Network Resilience 2024
The AER undertook a review on the Value of Network Resilience to address electricity supply outages lasting longer than 12 hours (prolonged outages).
Type
Reviews
Status
Current
Guidance on the efficient management of system strength framework
The AER has developed guidance intended to help System Strength Service Providers navigate the Efficient management of system strength on the power system rule.
Type
Guidelines
Status
Current
Values of Customer Reliability 2024
VCR play an important role in the identifying the right level of reliability investment, ensuring customers pay no more than necessary for reliable energy.
Type
Reviews
Status
Current
Trial projects guidelines - Regulatory sandboxing
Access guidance on how the AER will assess trial waiver applications and carry out our other functions in relation to trial projects.
Type
Guidelines
Status
Current
Connection assets
The NER require the AER to publish a register of existing dedicated networks assets and the identity of designated network asset owners.
Type
Reviews
Status
Current
Review of electricity transmission service standards incentive schemes
The AER is reviewing of aspects of the service target performance incentive scheme (STPIS) for transmission network service providers
Type
Reviews
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current