Results
204 result(s), displaying 133 to 144
Guidance on the efficient management of system strength framework
The AER has developed guidance intended to help System Strength Service Providers navigate the Efficient management of system strength on the power system rule.
Type
Guidelines
Status
Current
Values of Customer Reliability 2024
VCR play an important role in the identifying the right level of reliability investment, ensuring customers pay no more than necessary for reliable energy.
Type
Reviews
Status
Current
Trial projects guidelines - Regulatory sandboxing
Access guidance on how the AER will assess trial waiver applications and carry out our other functions in relation to trial projects.
Type
Guidelines
Status
Current
Connection assets
The NER require the AER to publish a register of existing dedicated networks assets and the identity of designated network asset owners.
Type
Reviews
Status
Current
Review of electricity transmission service standards incentive schemes
The AER is reviewing of aspects of the service target performance incentive scheme (STPIS) for transmission network service providers
Type
Reviews
Status
Current
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Transgrid VNI West contingent project application stage 1 early works
Transgrid Victoria to NSW Interconnector West (VNI West) contingent project application stage 1 early works
Type
Contingent projects
Status
Current
Transgrid - Ring-fencing waiver - Telecommunications services - April 2024
Transgrid seeking a waiver from transmission ring-fencing guideline to continue to own and operate 6 telecommunications services for a period of 12 months.
Type
Ring-fencing
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical