AusNet Services VEBM cost pass through application
AusNet Services Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
Origin Retailer of Last Resort Cost Recovery Applications
The AER has approved Origin Energy's six cost recovery applications for costs incurred as the Retailer of Last Resort for retailer failures in 2022.
Type
Cost pass throughs
Status
Current
Energex - Cost pass through - 2022 February-March flood event
On 30 March 2023, the AER released its determination on Energex’s 2022 February-March flooding cost pass through application.
Type
Cost pass throughs
Status
Current
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
SA Power Networks - Cost pass through - 2022-23 River Murray flood event
On 24 March 2024, the AER published its decision on a cost pass through application from SA Power Networks, seeking to recover costs incurred responding to the 2022-23 River Murray flood event.
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
Evoenergy - 2024–25 tariff variation notice
Evoenergy proposed new network prices to apply to its ACT gas network for 2024–25.
Type
Tariff variations
Status
Current
Multinet - 2024–25 tariff variation notice
Multinet proposed new network prices to apply to its Victorian gas network for 2024–25.
Type
Tariff variations
Status
Current