Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2021-22
Type
Tariff variations
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2021
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2020-21
Type
Tariff variations
Status
Historical
APA Victorian Gas Transmission System - Annual tariff variation 2020
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical
SA Energy Transformation RIT-T dispute
On 5 June 2019 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2019
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical