Results
233 result(s), displaying 49 to 60
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2021-22
Type
Tariff variations
Status
Historical
TransGrid and ElectraNet – Project EnergyConnect contingent project
Type
Contingent projects
Status
Current
AusNet Services – Cost pass through – 500kV Transmission Line Tower Collapse
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - Easement land tax 2021–22
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - Annual tariff variation 2021
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2020-21
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - Easement land tax 2020–21
Type
Cost pass throughs
Status
Current
TransGrid - Expanding NSW-QLD Transmission Transfer Capacity regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current