Results
125 result(s), displaying 49 to 60
Power and Water Corporation - Cost Allocation Method 2018
Type
Cost allocation methods
Status
Current
SA Energy Transformation RIT-T dispute
On 5 June 2019 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
ElectraNet – Cost pass through – extension of time limit to submit 2019 application
Type
Cost pass throughs
Status
Current
ElectraNet - Eyre Peninsula Electricity Supply Options regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
ElectraNet - Economic evaluation - Main grid system strength project (contingent project trigger)
Type
Contingent projects
Status
Current
Australian Gas Networks (SA) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
Power and Water – Cost pass through – extension of time limit to submit 2018 application
Type
Cost pass throughs
Status
Current