Results
9 result(s), displaying 1 to 9
ElectraNet - Cost pass through - 2022–23 Inertia network service
Type
Cost pass throughs
Status
Open
SA Power Networks - Ring fencing waiver - Market Active Solar Trial - January 2024
SA Power Networks has submitted a waiver application under provision 4.2 of the Ring-fencing Guideline (Electricity distribution)
Type
Ring-fencing
Status
Open
South Australia: January - March 2028
On 2 January 2025, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2028.
Type
Retail Reliability Obligation
Status
Open
SA Power Networks - Determination 2025–30
SAPN electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open
South Australia: December 2026 - February 2027
In its September 2023 update to the 2023 ESOO AEMO has forecast a 205 MW reliability gap in South Australia in 2026–27.
Type
Retail Reliability Obligation
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open