Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
Roma to Brisbane Pipeline - 2024–25 tariff variation notice
Roma to Brisbane proposed new network prices to apply to its Qld gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2021-22
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2020-21
Type
Tariff variations
Status
Historical
TransGrid - Expanding NSW-QLD Transmission Transfer Capacity regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
Roma to Brisbane Pipeline - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical