Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
Transgrid VNI West contingent project application stage 1 early works
Transgrid Victoria to NSW Interconnector West (VNI West) contingent project application stage 1 early works
Type
Contingent projects
Status
Current
Transgrid - Ring-fencing waiver - Telecommunications services - April 2024
Transgrid seeking a waiver from transmission ring-fencing guideline to continue to own and operate 6 telecommunications services for a period of 12 months.
Type
Ring-fencing
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Transgrid - Humelink early works contingent project - stage 1 part 2
The AER's decision in relation to Transgrid's Humelink stage 1 part 2 contingent project application.
Type
Contingent projects
Status
Current
Transgrid - Humelink early works contingent project - stage 1 part 1
The AER's decision relating to the Humelink early works contingent - stage 1 part 1.
Type
Contingent projects
Status
Current