Results
28 result(s), displaying 13 to 24
Energex - Determination 2025–30
Energex electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open
Jemena Gas Networks (NSW) - Access arrangement 2025–30
The AER will make a determination on the maximum amount of revenue that Jemena Gas Networks can earn from consumers over the period 1 July 2025 to 30 June 2030.
Type
Access arrangements
Status
Open
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
AusNet Services Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that AusNet Services can earn from customers over the period 1 April 2027 to 31 March 2032.
Type
Determinations
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Ergon Energy Cyclone Jasper cost pass through application
Ergon Energy's cost pass through application for Cyclone Jasper
Type
Cost pass throughs
Status
Open