APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Ergon Energy Cyclone Jasper cost pass through application
Ergon Energy's cost pass through application for Cyclone Jasper
Type
Cost pass throughs
Status
Open
Ergon Energy Cyclone Kirrily cost pass though application
Ergon Energy's cost pass through application for Cyclone Kirrily
Type
Cost pass throughs
Status
Open
Energex cost pass through application – South East Queensland storms
Energex’s South East Queensland storms cost pass through application
Type
Cost pass throughs
Status
Open
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open
AusNet Services distribution cost pass through - September 2024 storm
AusNet Services has submitted a cost pass through application to recover the costs it has incurred as a result of the September 2024 storm.
Type
Cost pass throughs
Status
Open