Results
47 result(s), displaying 37 to 47
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current
SA Power Networks - Cost pass through - Emergency standards 2021–22
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - Easement land tax 2023–24
Type
Cost pass throughs
Status
Current
NSW Electricity Infrastructure Roadmap - Contribution determination 2023-24
View our decision on the maximum amount electricity distributors can pass through to consumers in 2023-24 as costs for the NSW infrastructure investment roadmap
Type
Cost pass throughs
Status
Historical
Endeavour Energy - Ring-fencing waiver (streamlined process) - February 2023
Type
Ring-fencing
Status
Current
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open