Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current
NSW Electricity Infrastructure Roadmap - Contribution determination 2023-24
View our decision on the maximum amount electricity distributors can pass through to consumers in 2023-24 as costs for the NSW infrastructure investment roadmap
Type
Cost pass throughs
Status
Historical