Results
6 result(s), displaying 1 to 6
AusNet Services – Cost pass through - June 2021 storms natural disaster
On 16 March 2022, the AER released its determination on AusNet Services' cost pass through application.
Type
Cost pass throughs
Status
Open
ElectraNet - Cost pass through - 2022–23 Inertia network service
Type
Cost pass throughs
Status
Open
Central-West Orana - Renewable Energy Zone - Ring-fencing class waiver
A class waiver under the electricity distribution Ring-fencing Guideline enables DNSPs to potentially build and operate transmission infrastructure in a REZ.
Type
Ring-fencing
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open