Results
11 result(s), displaying 1 to 11
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
SA Power Networks - Cost pass through - 2022-23 River Murray flood event
On 24 March 2024, the AER published its decision on a cost pass through application from SA Power Networks, seeking to recover costs incurred responding to the 2022-23 River Murray flood event.
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
SA Power Networks - 2024–25 pricing proposal
SA Power Networks proposed new network prices to apply to its South Australian network for 2024–25.
Type
Pricing proposals
Status
Current
Australian Gas Networks (SA) - 2024–25 tariff variation notice
AGN proposed new network prices to apply to its SA gas network for 2024–25.
Type
Tariff variations
Status
Current
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
TransGrid and ElectraNet – Project EnergyConnect contingent project
Type
Contingent projects
Status
Current