Results
11 result(s), displaying 1 to 11
Roma to Brisbane Pipeline - Annual tariff variation 2020-21
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - Easement land tax 2020–21
Type
Cost pass throughs
Status
Current
TransGrid - Expanding NSW-QLD Transmission Transfer Capacity regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
ElectraNet - SA Energy Transformation regulatory investment test for transmission (RIT-T)
Type
Contingent projects
Status
Current
TasNetworks - Cost pass through - extension of time to submit application
Type
Cost pass throughs
Status
Current
APA Victorian Gas Transmission System - Annual tariff variation 2020
Type
Tariff variations
Status
Historical
AusNet Services (Transmission) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open