Results
11 result(s), displaying 1 to 11
ElectraNet - Main grid system strength contingent project
On 9 August 2019, the AER made a final decision in relation to ElectraNet's main grid system strength contingent project application.
Type
Contingent projects
Status
Current
Roma to Brisbane Pipeline - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical
SA Energy Transformation RIT-T dispute
On 5 June 2019 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
ElectraNet – Cost pass through – extension of time limit to submit 2019 application
Type
Cost pass throughs
Status
Current
ElectraNet - Eyre Peninsula Electricity Supply Options regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
AusNet Services - Cost pass through - Easement land tax 2019–20
Type
Cost pass throughs
Status
Current
ElectraNet - Economic evaluation - Main grid system strength project (contingent project trigger)
Type
Contingent projects
Status
Current
APA Victorian Transmission System - Annual tariff variation 2019
Type
Tariff variations
Status
Historical
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open