ElectraNet - Main grid system strength contingent project
On 9 August 2019, the AER made a final decision in relation to ElectraNet's main grid system strength contingent project application.
Type
Contingent projects
Status
Current
Australian Gas Networks (SA) - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical
SA Energy Transformation RIT-T dispute
On 5 June 2019 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
ElectraNet – Cost pass through – extension of time limit to submit 2019 application
Type
Cost pass throughs
Status
Current
ElectraNet - Eyre Peninsula Electricity Supply Options regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
ElectraNet - Economic evaluation - Main grid system strength project (contingent project trigger)
Type
Contingent projects
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current